• Chữa bài IELTS Task 1

    • thaomai.0918

      Participant
      February 14, 2018 at 6:12 pm

      The diagram illustrate the process of electricity distribution for domestic use throughout using solar power resource.
      Overall, there are 5 steps of this process from absorbing energy from the sun through solar panels to utilizing grid to provide electricity when people consume exceeding amount of energy produced by solar panels.
      As can be seen from the process, energy is firstly absorbed from the sun by a plenty of solar panels where it is turned into the DC current. Next, DC current is transferred to the inverter before it is converted into the AC current. The third step is concentrating the AC current in electrical panel that can distribute the electricity to customers’ house.
      When people use electricity produced by solar power exceedingly, there is an utility meter that can record any excess of solar electricity by flowing back to the grid through the meter. After that, electricity will be provided by utility grid.

      Attachments:
      You must be logged in to view attached files.
    • diemlinh

      Blocked
      February 23, 2018 at 3:32 pm

      [15:32:51, 23/2/2018] Cám ơn các bạn!

      Attachments:
      You must be logged in to view attached files.
Viewing 1 reply thread

The forum ‘Chữa bài IELTS Task 1’ is closed to new discussions and replies.

Original Post
0 of 0 posts June 2018
Now
Học Online cùng Premium